USFS has asked for assistance with cleanup of the shooting areas on 1N09 on Sat Jan 21.
USFS Rec and Fire personnel and Calguns will be there, and the OHV volunteers. We are getting a dumpster staged near the entrance. The shooting areas will be closed for the cleanup that day.
I’ll be meeting the OHV volunteers at Mill Creek Ranger station by the OHV seacrates (in back, 34.078427, -117.043992) at 8AM and heading over. We should be at the west end entrance at Hwy 330 (34.176984, -117.153823) around 9AM. I’ll be monitoring HAM 146.550
From Steve Thomsen, the USFS Rec contact who is coordinating: “It's gonna be a 2 part project. We are getting the tractor out there and rework the sites, re-sign everything, etc. There is a fuel break project in the work in the general area. Going to be a complete overhaul of the area.”
I was trying to find some attention getting pics to include, but I think I’ll just include my patrol report from Apr 2016 instead (see below). 1N09 is the longest road in the forest and has some really beautiful parts.
It would be great if some AAV folks want to participate, the more the merrier! If time permits, I’ll lead a patrol afterwards over 1N16 which is the next area we’re targeting for cleanup. These are 2 of the worst areas in the Mill Creek Outpost, long overdue for attention.
Post up if you want to join us, see you there!
Linda
USFS Rec and Fire personnel and Calguns will be there, and the OHV volunteers. We are getting a dumpster staged near the entrance. The shooting areas will be closed for the cleanup that day.
I’ll be meeting the OHV volunteers at Mill Creek Ranger station by the OHV seacrates (in back, 34.078427, -117.043992) at 8AM and heading over. We should be at the west end entrance at Hwy 330 (34.176984, -117.153823) around 9AM. I’ll be monitoring HAM 146.550
From Steve Thomsen, the USFS Rec contact who is coordinating: “It's gonna be a 2 part project. We are getting the tractor out there and rework the sites, re-sign everything, etc. There is a fuel break project in the work in the general area. Going to be a complete overhaul of the area.”
I was trying to find some attention getting pics to include, but I think I’ll just include my patrol report from Apr 2016 instead (see below). 1N09 is the longest road in the forest and has some really beautiful parts.
It would be great if some AAV folks want to participate, the more the merrier! If time permits, I’ll lead a patrol afterwards over 1N16 which is the next area we’re targeting for cleanup. These are 2 of the worst areas in the Mill Creek Outpost, long overdue for attention.
Post up if you want to join us, see you there!
Linda